Hi All

We have configured the correspondence language Z2 to Z7 for our custom need in t-code I18N.

Can you please help me as how to transport these languages to test environment from Dev environment.

There is no transport generated after this configuration.

IF we cannot transport it into test system, then do we have to configure it in test and production system manually.?

Please help

Regards

Ashish

z2-z7-i18.jpg (64.9 kB)
10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Best Answer
Andreas Lichtenau
May 23, 2017 at 08:19 AM
0

Hi Ashish,

you have to follow the steps from DEV system also in QAS and PRD.
Further information are also provided in SAP Note 302663.

Please also check this point:

It is generally not necessary to set up a Correspondence Language in a Unicode system. Exceptions are the following cases:

  1. The language exists in a non-Unicode system, and you want to continue using it after the conversion to Unicode.
  2. You need to exchange data in a system landscape between Unicode and non-Unicode systems. The language code used for the data is a Correspondence Language code (see SAP Note 871945).




Best,
Andreas

Show 1 Share
10 |10000 characters needed characters left characters exceeded

Hi Andreas

Thanks a lot for the quick response.

Thanks

Ashish

1