cancel
Showing results for 
Search instead for 
Did you mean: 

Update WAD links from BOBJ Production to Development environment

Former Member
0 Kudos

Hi All,

We have a requirement to update WAD links in the BOBJ portal for our project. The plan is to copy the WAD links from production and edit them as per the requirements and add them in the BOBJ dev portal. I don't have much hands on experience in BOBJ, being a BODS resource primarily. Can you please help on how to do this and any other detailed information on WAD would be extremely helpful.

Thanks,

Ronit.

Accepted Solutions (0)

Answers (1)

Answers (1)

BasicTek
Advisor
Advisor
0 Kudos

What are WAD links? Is that a report link, if so what type of report?

You posted in Bi authentication which is how to login to the product, not much help for migrating links, Usually you would use something like the LCM tool to do that. If that's what you want then you should change your post to that tag.

Regards,

Tim