Former Member
Feb 19, 2007 at 05:22 AM

Quantity Based Overheads

30 Views

Hi SAP Gurus,

I have a serious problem with Quantity Based Overheads. The client has asked for Qty Based Overheads in the last moment. And somehow it is not working properly. I have done it in ECC6 but it is not working in ECC6.

Kindly let me know any specific problem in ECC6 for calculating Qty Based Overheads.

I have done the following settings:

In costing Sheet i have given the parameters. Then in Material Master i have selected Material Origin. Then i have selected Qty indicator and given Unit of measurement in Relevant Cost Element.

URGENT. PLEASE

Solution to this problem will be suitably awarded with marks