cancel
Showing results for 
Search instead for 
Did you mean: 

How to control Notification creation while creating measuring document at plant level

Former Member
0 Kudos

For counter based Maintenance plans, while creating measuring document, if reading entered is greater than upper limit or smaller than lower limit, notification gets generated. For some plants, it shows pop up while saving measuring document, that do you want to create notification or not. And for some plants, it created notification directly without any pop up message. So, how can we control this setting at plant level and where to implement this setting?

Accepted Solutions (0)

Answers (1)

Answers (1)

peter_atkin
Active Contributor
0 Kudos

I'm assuming that you are using user-exit IMRC0001 (TCode SMOD) to create the notification from the measurement document.

If so, then get your ABAP Team to investigate.

PeteA