Hi all,
We had set the ESS BP in EP 7, everything was working fine.
Now someone restarted the server and we not get the following error when testing for Jco.
com.sap.mw.jco.JCO$Exception: (102) RFC_ERROR_COMMUNICATION: Connect to SAP gateway failed Connect_PM TYPE=B MSHOST=ecchostname GROUP=SID Public Group R3NAME=SID MSSERV=sapmsSID PCS=1 LOCATION CPIC (TCP/IP) on local host with Unicode ERROR partner '127.0.0.1:sapgw01' not reached TIME Wed Feb 14 18:29:11 2007 RELEASE 700 COMPONENT NI (network interface) VERSION 38 RC -10 MODULE nixxi.cpp LINE 2764 DETAIL NiPConnect2 SYSTEM CALL connect ERRNO 10061 ERRNO TEXT WSAECONNREFUSED: Connection refused COUNTER
In the EP server i checked the service file at C:\WINDOWS\system32\drivers\etc
and I do have sapgwSID 3600/tcp listed.
I also check the SLD, I refreshed and I could see all the ABAP and Java systems listed.
What could be wrong?
Please help
thanks
-Madhu