material master not made as per length, width & height.

In sales order Text. Finish mat. have mentions three criteria ( i.e. length, width, height.)

requirement is to collect semi finish & raw as per three criteria.

i.e. planned order is collected for same criteria.( i.e. same length will be club)

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Your question is not clear.

can you please explain

regards

Former Member
0 Kudos

Finish Product is Slab. Which have length range (500 to 1000) & Thickness range. (2 to 100) for finished product i.e. slab only one material master code was maintain.

While making sales order length & thickness is mention in sales order text.

Semi finished material also has one material master code. For all length & thickness range.

Requirement is that while mrp run. Separate planned order for semi finished material.as per actual length & thickness.

For example. One Sales order of finish product slab length 600& thickness 10.

Second sales order of slab length 700 & thickness 20.

While mrp run separate planned order for semifinshed material.

Former Member
0 Kudos

Hi,

I think Variant configuration is more suited for this requirement .

Bye

Anand

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi Mangesh,

use classification systemin material master to define size of product...

and while creating sales order use them for product specefication....

V.C. Process will be most suitable for this scenario...

regards

Hemant g

Former Member
0 Kudos

Thanks for reply,

But in VC also we have to define lot of material master as value.

please explain how to configure in V.C

i create two chart. length ( 500-1000) thickness (2-100).but to transfer in mrp exact value to semifinesh material

Former Member
0 Kudos

hi,

in MRP views , keep individual/collec indicator as individual. then planeed orders generated for individual sales order.

hope it may help you

regards

praveen

Former Member
0 Kudos

Hi Mangesh

Give a Customer specific material in "Customer Info record" TC VD51, for your product. Seperate CSMat for separate customer, and see whether works.

If not then VC may be the other option.

Regards

Krishna

Former Member
0 Kudos

Hi

As per my understanding

u want to club requirement as per Dimension of Product

But its not possible to Group according to dimension of product

Sunil Singh

former_member196398
Active Contributor
0 Kudos

Hi Mangesh,

If you could explain the real product scenario, the group may be able to help you out.

I your requirement should get covered by using Batch classification or materail classification.

Regards,

Prasobh