on 02-14-2007 11:17 AM
Hello,
For my client, I need to figure out a way to get the inspection results from QM into multiple batches. Is there a simple (standard) way to do this?
The situation is that my client produces 3 batches at once. Samples for analysis are only taken from 1 of those 3 batches. After the analyses, at the usage decision, the values need to be copied into the characteristics of all 3 batches.
Anyone can help me out with this one?
If all the characterisitics of the 3 batches are same, Can you please explain in detail the use of having multiple batches for one time production.
I am not clear, if the 3 batches produced are from same production order or from different orders.
Can you please explain in detail so that we can search for a best fit solution.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
as a matter of fact, PP is not used at my client (they refused). The inspection lot is created manually.
To answer your question, the 3 batches would be for the same production order (if PP was used). My client is a precious metal company. They cast large bars of metal. In one casting, they cast 3 bars which are 3 batches.
Hi,
That means you have only one inspection lot(manually created) for the production of 3 batches. But you can link only one material/one batch to an inspection lot in SAP. In your case, you can record the results for 1 batch and maintain the other batches in text field(that Inspection not required for other 2 batches).
By the way which inspectin type are you using?
WR,
Sanjeev
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.