Skip to Content
0

De-Activating Plants from Integration Model

May 16, 2017 at 01:12 PM

47

avatar image
Former Member

Hi,

There are two plants 1000 and 2000 in ECC and created a Integration Model Z001 by including both the plants, materials relevant to the plant , ATP check and activated the integration model. Now when I run the CFM1 transaction next time for the same integration model Z001, I have included only one plant 1111, its relevant material, ATP check filed and activated the model.

Now a sales order is created with delivering plant as 2000 and when availability check is done it checks for ATP quantity in SCM system.

How to de-activate a plant from integration model ? so that Availability check for plant 2000 takes place in ECC system.

regards,

Vijayakumar

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers