on 02-09-2007 6:02 AM
Hi
Please excuse for the most basic question.
From the trial downloads, I've installed the
ABAP and Java and would like to know the
post-install steps for activating and configuring
the Exchange Infrastructure component and
subsequent configuration
I've installed on the local host along with the
Microsoft Loopback Adapter. What should be
the connection parameters for the Visual
Administrator?
Any help is appreciated. Thank U.
Rajendra.
Hi Rajender
I think no question is difficult or basic .The severity depends on whether you know it or not,in other terms your comfort level.
Coming back to your post:Go through the below link
https://websmp103.sap-ag.de/~sapidb/011000358700001697502004E.PDF
If you need the XI configuration guide then visit:
Any issues feel free to ask
Reward with suitable points:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.