SNP Optimizer_Shelf Life of Component

Hi All,

Trying to use SNP optimizer to control WIP production if raw material stock is expired BUT NO Luck Yet.

Raw Material Settings- Procurement cost, Shelf Life Days, Min Shelf Life Days, Plng With Shelf Life

WIP Demand on 05/25/2017- 100 LB

Raw Material Stock = 1000 LB but Expired on 05/22/2017

When running optimizer for WIP, system is generating new planned order for WIP for 100 LB inspite of raw material "Cost of Material Disposal" (which is defined as hard constraint in Optimizer profile) is captured in IT_LOCMAT in result log.

Expectation is that if raw material stock is expired system should not create planned order even if demand exist.

There are postings and notes on snp optimizer shelf life topic but couldn't find any clue.

Please help.

Thanks

Ayan