Hi friend,

In MTO scenarion I have same (component) material in two different plant within the same client. During MRP run dependent requirement should be checked in the alternate plant's and if material is available reservation should be generated.

Or is it possible to convert planned order generated in plant 1100 be transfered to plant 1200 and also converted to production order.

Pls suggest the solution.