Material staging via WM-PP / Confirmation of Prod. Order

I want to use the standard process:

Materials are in storage location 9000, shall be kitted in 9030

Storage location of components in Prod.-Order is 9030

PSA has 9030 inside. Cycle exits. After finishing the confirmation shall take the components from 9030

TR is created, but is not possible to convert into TO as "incosistent quant data", even there is enough stock in 9000.

If I change the conditions: (PSA 9000; SLOC of components 9000) everything works.

But then the confirmation of prodorder is wrong: It removes components a second time from 9000, insted of 9030.

What is wrong? Thx.