on 05-15-2017 2:20 PM
Hi everyone.
I have a few questions and I hope you guys can help me:
1. When creating a certain routing (CA01), I want to set that it is required to assign a certain number of equipment PRTs to an operation. So it should be mandatory to assign at least 2 PRTs. How do I do this?
2. Furthermore, I'd like to make several screen variants (each with different standard values and with a different number of mandatory equipment PRTs that need to be assigned) which I can then assign to a certain tcode or something. Then I'd like to make 1 screen with buttons, so each screen variant (or tcode) can be assigned to a button. So when I click on the button, I go to a certain screen variant of CA01. Is this possible and how?
3. When I'm in CA01 at the operation screen and I click on an operation and then on the PRT button, I go to the PRT overview and immediately a pop-up appears with 'Create Routing: New PRTs'. This screen is automatically on assigning material PRT but I'd like to start with the equipment PRT screen. Is this possible and how do I do this?
If possible, please explain simple since I don't have much knowledge regarding SAP, especially not about user exits etcetera.
Can someone please help me?
I'd like to have a situation where depending on the input in the work center field, a certain number of equipment PRT are mandatory to add. How do I do this?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.