All,

I am running MRP daily in back ground .

For raw materials it will generate planned orders .

For Engg Spares I am using CBP and requirement will trigger with the same MRP run .

So whether it is possible to create directly PR's for Engg spares only ?

regards,

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

in the settings of the MRP-run You can basically determine, if planned orders should be created or purchase req's. For example: Call MD02 and check the settings respsctively both possible entries for PR's (1 or 2).

As a result for each material which has in the material master record in the MRP2-view the indicator (MARC-BESKZF: F = externally procurred) the system generates PR's.

To be able to differ on material level (even for a single material) You have to create a so called MRP-Profile in customizing and then assign this profile to the material in question (in Your case to all the Engg spares) on MRP 1-view , filed MARC-DISGR). If you want to change a lot of materials You can do this easily using MM17 [ mass change].

By using the MRP-profile you can determine on material level if MRP-run results in a planned order [PLO] or PR. Kindly note: The MRP initially always creates PLO no matter if the settings are F or X (!). Only by changing the parameters in the MRP-run You can skipp for material which are "indicated" with F the PLO and directly create PR's.

reward if it is useful

Former Member
0 Kudos

Hi,

As charlie is suggesting,change procurement type for all spares part as External.

It will work.

Regards,

MANISH

Former Member
0 Kudos

If you want PR's for all you Engg material then make the procurement type External only in material master then system will generate the Reqs only

sandeep_pv
Contributor
0 Kudos

Charlie,

Its not working .

Pls see that , I have already made settings for MRP run( which will be done in background ) that planned orders will be generated .

This planned orders made settings for Raw materials .

But for Spare I need PR.

Any suggestion ?

regards

Former Member
0 Kudos

no no no.........you have to change the procurement type for material in mm02 for MRP 2 view as external then system automatically generate the Reqs only