Workflow does not start for Offline triggered SHC

Former Member
0 Kudos

Hi,

I have a problem with getting the Workflow started during offline uploading of shopping cart from XI.

When I check on the BBP_PD status of the document, and there is no workflow started wherein when Shopping cart is done thru SRM Online, the n-step wfl approval is running correctly.

Any ideas on where I could check/configure settings to allow workflow to start during Offline upload from XI?

By the way, a function module BBP_SAPXML1_EXTREQU_UPDATE_IN is called to populate SHC data from Offline to SRM. Thus when this is ran, the document is now in the BBP_PD.

Thanks!

Cindy

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member195032
Active Contributor
0 Kudos

Hi Cindy,

What I feel that you need to use BADI for this Separate Determination Method for List of Approvers via BAdI BBP_WFL_APPROV_BADI in WS14000133:

In Start condition,make this BADI trigger in all the cases.Condition should be like

BUSINESS Object = Shopping Cart

Then determine the requirement that is shopping cart coming from someother system,that data will be some RFC destination or some generic id..as requirment from Plan driven scenario flow into SRM system with generic id from backend.

and based on that trigger approval process.

regards,nishant

please reward if this helps