About Sytem field??

HI

THIS ARIJIT

CAN ANYONE TELL ME THE

which system field keep track of each passin loop statement??

1)i have an doubt either it is SY-TABIX or SY-INDEX........

2)how can i delete an active job in background proceesing??

I WILL REWARD BY POINT..

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

5 Answers

  • Posted on Feb 01, 2007 at 07:01 PM

    1) SY-TABIX will keep track of the number of loops when using LOOP statement, SY-INDEX will do the same when doing a DO loop.

    2) You can do this from SM37

    Regards,

    Rich Heilman

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 01, 2007 at 07:01 PM

    Hi,

    Which system field keep track of each passin loop statement??

    1)i have an doubt either it is SY-TABIX or SY-INDEX........

    SY-TABIX

    2)how can i delete an active job in background proceesing??

    You can use SM37 to delete active job.

    Path: Select Job -> Job (Menu) -> Cancel active job

    Regards,

    Ferry Lianto

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2007 at 07:02 PM

    Hi,

    1)

    If it is LOOP AT ITAB....ENDLOOP..Then it is SY-TABIX.

    If it is DO..ENDDO..Then it is SY-INDEX.

    2)

    Try this..

    Go to SM37..

    Give the job name..

    In the menu JOB -> CANCEL ACTIVE JOB.

    Thanks

    Naren

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2007 at 07:02 PM

    Hi,

    1) SY-TABIX will keep track of each passin of a loop statement

    2) SM37, you can delete the background Jobs

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 01, 2007 at 09:02 PM

    Hi Arijit,

    small addition:

    SY-TABIX should be asked directly (next statement) after LOOP, SY-INDEX directly after DO. Because if do anything else before, the value may be changed in a subroutine or function called.

    You may cancel any process

    - as mentioned in SM37

    - in process overview (SM50)

    Online processes get stopped if you cancel the user session from SM04.

    Regards,

    Clemens

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.