cancel
Showing results for 
Search instead for 
Did you mean: 

APO PP/DS scheduling using number of individual capacities in shift

matteo_bongiorno
Participant
0 Kudos

Hello gurus,

the problem is the following: Work center in R3 have number of individual capacities based on the shift interval. This value is used to reduce dynamically the operation duration of all the routing allocated on that work center based on the time period. Flag for considering this value in the routing is set.

The resource (multimixed) in APO is set as external capacity and the correct capacities are displayed day by day. But the scheduling made during the mrp run does not consider this value. The number of capacities is considered only if is set in the routing in the number of split and ciffed in APO within the PDS. It works, but is not dynamic by interval.

If read also other thread about this and found oss note, but nothing useful to reach my goal. Someone have any ideas how to manage it? Is it possible that the scheduling in sap APO cannot reproduce the ECC behaviuor????

Thanks in advance.

M.

Accepted Solutions (0)

Answers (0)