Former Member

Automatically start tcode after saving tcode

Hi everyone,

When creating equipment (IE01) is done, I now need to manually create a new measuring point (IK01) for the equipment and then assign the measuring point to the equipment again (IE02). So I have a few questions regarding this:

1. Is it possible to automatically create a measuring point (with certain settings) when creating equipment and then automatically assigning this measuring point to the equipment?

2: Is it possible to automatically (when saving the creation of equipment at IE01) go to the screen where I can create a measuring point (IK01) and then (after saving the measuring point) go automatically to changing the equipment (IE02)?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    May 11, 2017 at 06:46 PM

    Hi,


    Normally you would create the measuring point from within IE01 or IE02 transaction - by selecting the Measuring point/Counters icon or Ctrl+F3.

    Is there a reason not to do it that way?

    -Paul

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks for your answer! Never noticed this was possible but now I see!

      Thank you very much for your answer!!

  • avatar image
    Former Member
    May 15, 2017 at 11:54 AM

    I have one question more. It is possible to set it mandatory to add a measuring point?

    I tried doing so with a transaction variant (SHD0), but if I set the field for measuring point mandatory, and I move to the PRT Tab, I first need to assign a measuring point before I can click on the Measuring point/counters icon. This is not useful since I first need to create it and then need to assign it and not the other way around. Is there a possibility to do so?

    Add comment