on 01-29-2007 10:01 AM
Dear friends,
I wants to close my process order. While closing the order i am getting following error:
System status CRCR is active (ORD 70000623)
Message no. BS013
Diagnosis
Object ORD 70000623 has system status CRCR (Control recipe created). According to this status, transaction 'Complete' is not allowed.
Procedure
You can only carry out the requested function if this is allowed according to the status of the object.
Please guide me to solve this
Thanks
Senthil
Hi Senthil,
Solution:
1) Go in Transaction CO57.In that enter the process order number.Then for the control recipe , search the recipe assigned..
2)In the next field Control Recipe status is 'Processed'.Change it to "Discarded".
3) Then press enter and save it...
4) Then go in CO54.enter plant and process order no.Press enter...select the details and then click on send button.You can check the message posted by clicking log button besides send button..
5) Now the status of order if u check it has been changed to CRAB.
6) Then TECO the order and close it....
Regards,
Ameya K.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ameya,
I have entered into t.code CO57. In that t.code there is no option to enter my process order. It just asking for process message category and plant.
I could not follow your instruction.
In t.code CO54, if i enter my process order for my plant, systemm is displaying the message of " NO ENTRIES MATCHING THE SELECTION CRITERIA HAVE BEEN FOUND"
PLEASE CLARIFY
THANKS
SENTHIL
Please use the transaction code CO60 to open the PI sheet for the process order in the specified plant.
open the PI sheet in maintain mode, then from the menu use the Complete or discard option which will change the control recipe status (PI_CRST message will be posted automatically).
Please check in CO54 if the PI_CRST is posted or not.
Once the aboce message is posted, then you can close the Process order.
Check in the Process order functions menu, Control Recipes if the status is changed to Completed.
Or use CO57 this is to create the message manually.
Specify the plant and the Message Category as PI_CRST,
Give the process order number, control Recipe number
the date and time will be populated automatically, do not change the status leave as it is prompted by the system.
Post the message using CO54, Then you can close the Process order.
Hope this helps you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Murthy & Ameya,
Thanks for both of you. Ameya, u have said to select to select the staus of control recipe as "Discarded" but Murthy has said "Do not change the status of contorl recipe" (leave it as it is. Sytem by default it is setting the status as "Processed").
What is the importance of setting this control recipe status?
then one more question
Posting the message in CO54.
I am entering my process order & message cat as PI_CRST & press "Enter". System brings "Process message moniter:Messages" screen. In this screen, i am selecting one message & pressing "SEND" button (Control + Shift+ F12). then if i refresh, status is coming as "SENT" with green colour indicator.
But i do not know, what happens in background? Where the message will be sent?
I have found two options of "SEND" One is by Control + Shift + F12 & another one is in top menu( List---Send(Shift + F8).
what is the difference between both of these?
Thanks
Senthil
Hi Sri,
As you said, in t.code CO60 (Find PI sheet), i have entered my plant & process order, but system is not bringing any PI sheet. I am getting the following message
"No PI sheet matching the selection criteria has been found
Message no. C0596"
One basic question..Is the term Control recipe & PI sheet..both are same?
In process order, functions...my control recipe is still as "create" status.
Thanks
Senthil
The Control Recipe should be in Sent status, until unless you will not find it in CO60 or CO55.
Select the control recipe and Click on send button or by other option you have quoted with the hot keys.
After the status of the Control recipe is SENT, then you will find it in CO60.
Basing on your decision you may confirm and Complete the PI Sheet/Control Recipe or Discard it.
Hope this will help you.
Hi Sri,
Thanks. U have not told" If i select SEND button, where it will be sent?".
In t.code CO54, i am getting 7 messages.
Message number 1--got the status of SENT
While sending message number 2,
: i am getting "Destination Error" --show below:
Error 1
<b>Destin. Z001: Char. PPPI_MATERIAL_PRODUCED for target field QUANTITY_PRODUCED is not in the message</b>
Message no. CB341
Error 2:
<b>Message could not be processed by destination Z001 COCI_CONFIRM_MATERIAL_PROD
Message no. CB361</b>
Diagnosis
The destination Z001 is assigned to the selected process message via the message category. In the message category, the characteristic PPPI_MATERIAL_PRODUCED is assigned to the target field QUANTITY_PRODUCED of this destination. However, this characteristic is not contained in the process message.
It is possible that the message cannot be processed by the destination Z001.
Procedure
1. In the message log, check whether the message has been sent to destination Z001.
2. If the message has not yet been sent to any destination, you can now complete and send it from the message monitor.
If the message has been sent to other destinations, but not to the destination Z001, manually post the message data if necessary.
Please advice me ..how to solve..even i could not understand the error.
Give your mail ID , i will forward the error with screen shots
Thanks
Senthil