Skip to Content
0

Day assignment type error in IT 2011 (PA30)

May 09, 2017 at 02:19 PM

29

avatar image
Former Member

Hi All,

I need your support with the following can someone help.

This employee for example has 2 working days on the 19.03 and the 20.03 on his Work Schedule (IT0007)

However on the 19.03 he didn’t have clocks in out, but he has on the 20.03. The system should give then an error message (Tr PT_ERL00) that the employee was not at work on the 19.03.


The problem is that the system assigned the clock in / out to the previous days since it is the first day to be processed, so then on the 20.03 it gave an error that the employee was not at work.

But this is wrong, the error should be on the 19.03 and the assignment type should be = and not <

See below Screen shots.

Thanks,

Sharon

capture2.png (19.5 kB)
capture-1.png (32.0 kB)
10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Sam Smith Jan 05 at 06:44 AM
0

Instead of assigning a shift in IT0007, use IT2003. Evaluation the Time Evaluation Program (Tr PT60) and check the results.

Share
10 |10000 characters needed characters left characters exceeded