on 01-25-2007 7:33 AM
Hi~
There is a scenario "File to IDoc".
The flow of the scenario is legacy file system -> XI -> R/3.
Then,
Is it correct to configure only in XI using IDX1 & IDX2?
If it isn't correct, then should I configure in R/3 using WE20 & WE21, too?
Hi,
As you are going to post an Idoc from XI to R3 system, you need the following in XI,
1. RFC Destination pointing to R3
2. Port in IDX1 pointing to R3
SLD -> Create Business And technical systems.
In R3
1. You need the partner profile in we20 .
2. You do not need to create a port in We21.
Regards
Bhavesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks, Bhavesh~
Thanks for your kind and fast answer.
I'll try it.
Now, I have another question.
On the contrary,
How about Outbound IDoc?
In R/3
1. RFC Destination pointing to XI. (SM59)
2. Create Port using RFC Destination in WE21.
3. Partner Profile in WE20.
In SLD
...
Is that all?
Are there another configurations in XI?
Hi,
><i>In R/3
1. RFC Destination pointing to XI. (SM59)
2. Create Port using RFC Destination in WE21.
3. Partner Profile in WE20.</i>
perfect on R3. The only difference will be that the Partner Profile now will have an Outbound Idoc as R3 is sending the Idoc. In the case of Idoc to file, the partner profile will have an inbound entry in it.
SLD 0f XI
1. Create tech System for the r3 system -> this will be a webasABAP
2. Create business system for the CLient of the r3 system --> webasABAP and make sure that tyhe logical system name is correct.
Use this business system as the sender system.
Partner Profiles are always done on the SAP R3 system.
Regards
Bhavesh
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.