Skip to Content
0

Storage location and staging indicator selection in process order

May 09, 2017 at 11:54 AM

29

avatar image

we are having a problem with a specific material , when adding an extra line for an already existing component in a process order for this extra line the storage location and material staging indicator are not being filled. While the original line for this material does have this line.
We create a process order with a PV, we use control cycles and issueing storage location in the bom is filled. We only have this issue with one material. What could be wrong ?

I checked all obvious masterdata elements.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Michel Smulders May 09, 2017 at 12:54 PM
0

sorry i made typing error

we are having a problem with a specific material , when adding an extra line for an already existing component in a process order for this extra line the storage location and material staging indicator are not being filled. While the original line for this material does have this information filled correctly.
We create a process order with a PV, we use control cycles and issueing storage location in the bom is filled. We only have this issue with one material. What could be wrong ?

I checked all obvious masterdata elements.

Share
10 |10000 characters needed characters left characters exceeded