on 05-08-2017 5:55 AM
Hello,
For a production facility, we measure the production reliability by calculating Schedule Attainment for each Product/Location ( compare Actual Produced Qty vs Planned Qty).
In IBP Inventory, how can one capture this supply variability in Safety Stock Calculation? Appreciate for all feedbacks and recommendations.
Thanks,
Tushar
Adherence = ABS (Actual Production Qty - Planned Production Qty)/Planned Production Qty
Production Lead Time CV (%) = 1.25 x (1 - Adherence) x PBR / PLT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi! Could you explain the 1.25 factor in the formula please?