on 05-05-2017 4:14 AM
HI All
We are doing greenfield installation and migration is from PI 7.31 dual stack to PO 7.5.
We are preparing PO dev from PI7.31 production.
Basis is not sure of how to transfer SLD contents to new SLD (PO) and ESR /ID from PI production to PO dev.
SLD synchronisation or one by one export import ??
We have around 180 interfaces, 35 SWCV etc.
Can someone throw some light in this.
Thanks
Hi Apu,
In my knowledge we don't have any tools to migrate ESR objects, We have to manually export/import the ESR objects.
Thanks,
Pavan T
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pavan,
Is there any standard tool available to migrate ESR contents now?
I have used only Directory Content Migration tool to migrate ID components.
Thanks,
Apu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi SAP PI,
you can use SLD synchronization for transferring SLD objects or use export/import option.
you can use SAP standard migration tool to transfer the 180 interfaces into new PO environment.
Thanks,
Pavan Tcapture.jpg
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.