cancel
Showing results for 
Search instead for 
Did you mean: 

reg: SLD Objects transfer

PS23
Participant
0 Kudos

HI All

We are doing greenfield installation and migration is from PI 7.31 dual stack to PO 7.5.

We are preparing PO dev from PI7.31 production.

Basis is not sure of how to transfer SLD contents to new SLD (PO) and ESR /ID from PI production to PO dev.

SLD synchronisation or one by one export import ??

We have around 180 interfaces, 35 SWCV etc.

Can someone throw some light in this.

Thanks

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member200386
Active Participant
0 Kudos

Hi Apu,

In my knowledge we don't have any tools to migrate ESR objects, We have to manually export/import the ESR objects.

Thanks,

Pavan T

apu_das2
Active Contributor
0 Kudos

Hi Pavan,

Is there any standard tool available to migrate ESR contents now?

I have used only Directory Content Migration tool to migrate ID components.

Thanks,

Apu

former_member200386
Active Participant
0 Kudos

Hi SAP PI,

you can use SLD synchronization for transferring SLD objects or use export/import option.

you can use SAP standard migration tool to transfer the 180 interfaces into new PO environment.

Thanks,

Pavan Tcapture.jpg

patelyogesh
Active Contributor
0 Kudos

Most important thing is : Before you sync SLD make sure you have update CR Content on both SLD to same versions

-Yogesh