Hi SDN,
I have a hierarchy with validation dates 1/1/004 through 12/31/9999. I want to copy the same hierarchy such that the two hierarchies are as follows:
1. From 1/1/2004 thru 12/31/2006
2. From 1/1/2007 thru 12/31/9999
How do you copy hierarchies and then change dates?
Thanks.
Saf.
Add a comment