on 01-04-2007 8:47 PM
Hi Gurus,
I have to do system refresh or system copy from test to dev i.e. development system has to be refreshed. Can any one tell me the procedure how to follow the steps in solution manger. How to prepare this system copy in solution manger????
Thanks in advance.
Hello,
System copy specified with same db/os term as homogenous migration, fyi.
You need to get SAP NW04 bundle to run prepare and system copy phase startup options are there in SAPINST front end. Ensure your SM version should be 3.1
Thanks,
AKL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
No system copy is Os/db task not handle in SM 3.1 or SM4.0
It will done by regular procedure with SM.
Involve DBA and OS admin for this activity.
Take complete backup for system and start system copy. SM 4.0 is core component for BPBCRM 4.0. Use NW04 SAPINST tools.
Revert if any problem.
Thanks,
Amit
Dont forget to rewards full pts.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.