Skip to Content
0
Former Member
May 01, 2017 at 12:24 PM

LSMW: Change a material BOM

649 Views

Hi everyone,

I am using LSMW object:0030 Method: 0002 Program name: RCSBI020 in order to change a BOM.

As far as I can read from the documentation it will as standard delete any items on the BOM that is not included in the upload file - is this correct and is there any way to circumvent it?

If I am looking to change a specific material on a BOM do I need to specify the item number as well every time or is there any way to circumvent this by only specifying the material?