BOM explosion at PR without validating configuration.

0 Kudos

Hi All,

Subcontracting PRs created with respect to sales orders for configurable materials. However system consider all the components during BOM explosion at the time of PR creation. Business expect it should explode only configurable components during PR creation.

For EX :

Material BOM contains 5 components, at sales order configuration level, we selected only 2 components, but at PR level BOM exploding 5 components and subsequently consumption happened for all the 5 components during goods receipt.

Please share the required configuration/steps to be performed for this requirement.

Thanks in advance.

Santosh

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

You may find your answer in the OSS note 588117 - FAQ: Configurable materials in purchasing