on 12-19-2006 2:16 PM
Hi,
I have used the idoc bundling trick to create multiple idocs by referring to Michal's blog "/people/michal.krawczyk2/blog/2005/12/04/xi-idoc-bundling--the-trick-with-the-occurance-change
However,since all the idocs reach r/3 at the same time.
Is there any way to delay the posting of subsequent idocs.
Hi,
You can achieve this using a BPM.
After the mapping, use a par for each block. In the block, have a wait step (that waits for specific time period) and a send step to send the idoc.
When the 1st idoc is sent, the second idoc will be sent after "n" seconds. ("n" is the time specified in the wait step)
Regards,
Smitha.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The more easy and standard way is to set the processing of IDoc in background in the partner profile, from WE20 in the backend
Regards,
Sandro
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.