Hi,

Please find below my urgent requirement.I've heard that its possible through SPRO settings.Can anyone give me complete guidance.Reward points will be there.

Batch Determination:

In Transaction VL01N/VL02N for Delivery, the system should propose only those Batches which contain Deliverable Quantity with the earliest Expiry Date. System should split the Batch nos. in case of non availability of quantity in one batch. This splitting will be based on the material available on Supplying Plant.

e.g. if Order quantity is 50 c/s and batch wise available quantity in system are as following on supplying plant.

10 c/s 2006BG101 Exp. Date is 12.02.2008

20 c/s 2006BG501 Exp. Date is 12.08.2008

100 c/s 2006BG801 Exp. Date is 12.02.2009

System should split the batch no. and proposed as following.

10 c/s 2006BG101 Exp. Date is 12.02.2008

20 c/s 2006BG501 Exp. Date is 12.08.2008

20 c/s 2006BG801 Exp. Date is 12.02.2009