cancel
Showing results for 
Search instead for 
Did you mean: 

MM / PP Integration Points

Former Member
0 Kudos

Hi,

Can someone please explain or highlight the main integration points between MM/IM and PP.

Thanks,

Jey.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Integration points with MM/IM and PP are some of the following -

When a Production order is created and released a reservation gets created for the materials in BOM

When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.

When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.

When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.

When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.

If WM is configured an associated internal movement for all the above movement types will be posted.

During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.

During availabilty check of a production order basing on the availability check configured materials will be selected and checked.

Hope the above may help you.

Answers (0)