Skip to Content
0
Former Member
Dec 16, 2006 at 07:31 AM

Change in material valuation- MAP

26 Views

Hello,

When I change the valuation of a material with price control MAP in the T. Code MR21, the system creates accounting, controlling and profit centre documents. But the system does not change the price in the material master in the current valuation price (material master / accounting 1 tab page) to the changed price and maintains the old price only. In the previous period/year button the changes are recorded.

Whether this is a standard thing the system does or some modification is required? I want the system to calculate the changed prices only in all the reports.

Pls help me

Regards,

Ajit Patro