Skip to Content
0
Dec 11, 2006 at 01:24 PM

Problems in SEND STEP with transport confirmation

21 Views

Hi everyone.

I have a send step in a BPM. This send step has the 'transport confirmation' switch activated. If destiny system (SAP R3) is down, XI will retry to send the message.

Problem is that XI has been waiting for a long time (because of R3 backups) and now, the interface is stoped on that step, waiting for the transport confirmation that isn't going to arrive.

I would like to now the way to 'restart' this step because XI must notice that R3 is up again and is not sending the message.

Regards.