Hello,
We have requirement IM - Program positions and internal orders plan data needs to be updated from BPS to ECC.
We have created plan cube same structure as 0IMFA_C03 and added some data through manual planning template
Our Planning Level contains following fields.
1. Order
2. Program position TOTAL CAPEX (Hierarchy from ECC)
3. Approval year 2007
4. Company code 1000
5. Controlling Area 1000
6. Currency
7. Currency Type 10
8. Fiscal year/period
9. Fiscal Year Variant Z1
10. Program definition IMP2
11. Req.cost canter ZRCOST05
12. Value type 20
13. Version 0.
We have created Planning function type exit and called function modules UPB_CI_PUSHBACK_MATH_IP
UPB_CI_PUSHBACK_INIT
And also created parameter group with following parameters as Note 503399.
Disp. n. mat. Prpos
Save Mat. Pr. Pos.
No Puba for progpos.
Planning Area ZPA003
Logical System FCD110
Exch.rate type X
Test Mode
When we execute the planning function data is reading from info cube successfully but not updating the ECC tables. Terminating with internal program position assignment error
Errors occurred when executing planning function ZPF00003 (Retraction of IM Data)/ZPG00003(Retract data)
>>>>>>>>>>>>>>>>> STRATEGIC CHARACTERISTICS <<<<<<<<<<<<<<<<
Matching takes place with the following strategic characteristics:
0CO_AREA
0COMP_CODE
0PROG_DEF
0IM_CORPOR
INTERNAL_ASSIGN_ERROR_DD03P
32 data records were read, 0 of them were changed, 0 generated
As per function module documentation I have assigned following STRATEGIC CHARACTERISTICS in transaction AIBW01
0CO_AREA
0COMP_CODE
0PROG_DEF
0IM_CORPOR.
Anybody is experienced with IM retraction Please advice
1. How to set-up this retractor correctly.
2. For our requirement what strategic characteristics assigned in AIBW01.
3. What about RFC connection ( I hope we have active source system connection between BI and ECC.
Thanks in Advance.
Regards,
RC.