Dear all,
We have two R/3 systems :
1. ECC5.0 that we use for HR
2. ECC6.0 for all other modules (FI,SD,CP,PA....)
We have one Portal running NW04 EP6 SP15 in Solaris 10, Oracle DB environment.
In the Portal, we are running some ESS HR services. We want to look at implementing Travel and Expenses which is mainly FI configuration tied some to HR.
How can we point the Portal to connect to the ECC6.0 system for Travel and Expenses. The JCo connection destinations SAP_R3_Travel and SAP-R3_Travel_Metadata hav been configured to connect to the ECC6.0 system.
The Portal system definition has been created to connect to the ECC6.0 system. However, we are told that the alias to use for Travel and Expense is "SAP_WebDynpro_XSS". This alias is currently assigned to the ECC5.0 (HR) system. How can we overcome this? Are split ESS systems possible?
Thank You in advance
Regards, Neeta