Hello,

we have two SLDs, one for dev. Xi and one for prod XI.

So per SLD only one XI is known.

On SLD dev we implemented all required R/3 systems and included the transport groups to the systems and the transport connection (dev. syst to prod. syst).

So here the prod R/3 has as connected XI the dev XI!

Now we want to move the content of the dev SLD to the prod SLD.

What will happen to the related XI system in the business systems.

Do we have only have to change them in the destination prod. SLD?

Best regards

Dirk

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Dirk,

>>>> <i><b>So here the prod R/3 has as connected XI the dev XI!</b></i>

Can you please explain why are you connecting Prod R/3 system to Dev XI system ? Typically Dev R/3 should be connected to Dev XI and the same for Prod.

-


You do not have to change the related integration server for the business systems in Production Server.

Consider this. In Dev landscape, you have business system BS1 for which related Integration Server is say IS1. In Prod landscape, there is business system BS2 for which related integration server is IS2.

Now for BS1 you specify transport target as BS2. Therefore, when any SWC which belongs to BS1 in Dev, gets transported to Prod, it starts pointing to BS2 now.

Hope this helps.

Regards,

Former Member
0 Kudos

I guess I understood the question differently !

Yes, for the business systems in Dev and Prod, you will have to configure their related integration servers during setup. This is one-time activity.

After this is done, then you can transport XI objects to production, where the integration server will be automatically taken as the destination Integration Server.

Regards,

Former Member
0 Kudos

Hi Shankar,

thanks for the detailed work on my question.

Unfortunately it wasn´t me who had to organize the environment.

Customer made the installation and then was asking for external consultancy.

So the situation was fixed a little bid away from simple logic.

For a go live at end of the year we will use this construction.

Next year customer plans to implement a new central SLD (including portals issues).

Then we will do another move with our SLD content.

Until then customers Xi guys can train a little bit on moving SLD content

to ensure that both SLDs have the same systems implemented.

Only to complete that:

To use transport groups you need prod XI and dev XI both on one SLD else you cannot link the R/3 systems to dev and prod area because transport groups have to be linked to the XI systems on the SLD.

So, my question was a little bit useless!

We had no prod XI available on the dev SLD.

From this issue my question was coming up.

We will add the dev XI to the prod SLD too.

Then moving content won´t cause any problems, I think!

Regards

Dirk

Message was edited by:

Dirk Meinhard

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Yes, You will have to change the Business system details manaually in production SLD directly.

Regards

Su