cancel
Showing results for 
Search instead for 
Did you mean: 

LO-JOB CONTROL

Former Member
0 Kudos

hi,

What process takes place in jobcontrol at LO COCKPIT.?

URGENT

SRIDEVI

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Sridevi-

Under the jobcontrol you are supposed to schedule the V3 updates..

After doing this only ..the deltas get updated into the Delta Queue.(RSA7).

Regards,

Vishwa.

"Saying THANKS In SDN is Thru Assigning Points ".

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi sridevi,

V3 job control , you set the job control in back ground or immediately or after event, etc.

without set the v3 job control data doesn't come to deltaqueue.

V3 updates are serizes v3 update or unserized v3 update or queuedelta or direct delta.

Regards,

Ramesh