on 04-20-2017 8:02 AM
Hi,
I classified 3 work centers with class type 019 and the same characteristic value (there is only one characteristic & only one value). then I classified the operation in the routing.
the valid from date in the class is 1.1.2014,
the valid from date of the operation in the routing is 20.4.17.
when I cif the pds to apo I see only 1 mode in the pds...why? there should be 3 modes...
any idea what might be wrong?
I use apo 7.3 on S4Hana.
thanks,
Pilvi
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.