hi all
I have a problem with MRP run. When i create requirements through SOP and transfer them through MC74 demand management and run MRP, it is not taking the PIR's values but when i create PIR's through MD61 for the same material and run MRP, it is taking the values. I have tried checking up all the possible configuration screens. could some one tell me where the problem is.
thanks in advance.
chandra