The steps I have are in this order....
Check Central Instance Profile Settings (p15)
Generate Roles for SAP_XI and SAP_SLD (p31)
Assign application roles to User Groups (p33)
Import the SAP Exchange Profile (p33)
Perform SLD Configuration (p34)
 Apply SAP Note 712594 (p34)
 Maintain SLD Connection Parameters (p34)
 Maintain Server Settings in SLD (p34)
 Update the CR data in SLD (p35)
 Configure SLD Bridge (p36)
 Configure the SLD Clients with SLD Administration (p36)
 Maintain the ABAP connection (p37)
 Configure the SLD Data Supplier Service in the Visual Administrator (p37)
 Maintain the Product for the Technical System (p38)
 Maintain a Business System for the Integration Server (p38)
Create and Test RFCs in the ABAP and Java Client (p41)
Activate ICF Services (p43)
Create HTTP Destination PMISTORE in the Java Environment (p43)
Configure the Role of the Integration Server (p44)
Import the XI Content for SWCV SAP Basis 6.40 SR1 (p46)
Configure the Gateway Service of the Central Integration Server (p48)
Trigger Data Transfer to the SLD (p48)
Check the Connection Parameters in the Exchange Profile (p49)
Now one is this the correct order and 2 have I missed anything... Please dont give me links please could you just give steps.....
I want to move SLD from Dev to Prod