Dear friends,
I having one plant called PLT1. Within this plant i am having 3 stores.
Store1 : 1000--For Main stores (Raw materials)
Store2: 2000- (Production store, for keeping semi finished and finished goods)
Store3: 3000-- ( Ware house store---for keeping finished goods in sales warehouse).
I am running MRP in MD02. After confirming my production order i am stocking my finished goods in store 2000. Then i am transfering my finished goods to 3000 (marketing ware house) from 2000 (production stores).
So when i am running next MRP run , the system should not consider the stock of store 3000. It should only consider the stock of 2000.
For this indent, i want to configure the system for MRP area.
while i am cofiguring MRP area, it is asking for "Receiving storage location".
In this field which storage location should i give (either 2000 or 3000).
Then if i select "Assign storage location", i have assigned storage location 2000.
Is it correct?
In stead of doing all these, i have found some other alternative also in material master.
In Material Master MRP4 view, in "Storage location MRP" if u select 1(storage location stock excluded from MRP), this store stock will be excluded from MRP.
Now if run MRP in MD02, i am getting my message "3000 store stock not planned". Can i choose this way?
Thanks
senthil