assign component / batch number at subcon PO

550 Views

hi,

We are using external batch number assignment to manage our components. At component overview of subcon PO, we will maintain the issue storage location and batch number of the component. However, we fount out error meesage ME178

, batch XXX not maintained for material XXX, will pop up if the batch master hasn't been created at that storage location. This has impacted on our biz process. That means we can't assign batch and storage location before we transfer the stock to that storage location. I tried to switch this system message to warning. But I can't locate it. Any input? Thanks.

Regards,

Nancy