Hello Team
There are 4 operation in our production order scenario inspection type (03) we wants the inspection lot to be created for 3rd operation what special setting needs to be done ?
Br, Kiran
Hi Kiran.,
The lot is generated for result recording,UD etc, hence create an operation view with control key PP04 in routing CA01 and assign the relevant inspection characteristics to it and save the routing process. Record the results for the operation(3rd operation which you said ) defined in routing plan for the inspection lot generated and complete the UD.
Thanks in advance.
Kindly revert your feedback if useful.