Automatic Inspection Lot for an operation

Hello Team

There are 4 operation in our production order scenario inspection type (03) we wants the inspection lot to be created for 3rd operation what special setting needs to be done ?

Br, Kiran

Add comment
10|10000 characters needed characters exceeded

  • Have you read the basic rules for this site? That is a farily standard, basic question an probably has multiple related questions on the web about it. Not to mention the SAP help files.

    Please do some research, test and get back to us if you have a specific question.

    Thanks,

    Moderator

  • Get RSS Feed

1 Answer

  • Best Answer
    May 02, 2017 at 12:23 PM

    Hi Kiran.,

    The lot is generated for result recording,UD etc, hence create an operation view with control key PP04 in routing CA01 and assign the relevant inspection characteristics to it and save the routing process. Record the results for the operation(3rd operation which you said ) defined in routing plan for the inspection lot generated and complete the UD.

    Thanks in advance.

    Kindly revert your feedback if useful.