Hi everyone,
This is really urgent,
Early watch report has showed that our update optimizer statistics are not up to date.So i m thinking to schedule Update optimizer job thro DB13.My system setup is very big n is linux based.So when do u feel is the best time to schedule that(load wise),and how much time will it take(system is on cluster plus 14 app servers),so its a real big one and an Early watch has to be schedule jst after that.
Please advise.
Its urgent