Hi everybody,
does any of you know how to do the cost assignment mandatory in infotype 0014?
We have use the feature COBLT and table T588N for Function Module RP_TIME_COBL_002, and now the field COBL-AUFNR is mandatory, but we need the cost assignment to be mandatory, I mean should be impossible to save a new record without cost assignement. Is is possible using standard functionality or I have to use the user exit in PAI?
Thanks in advance.
Cristóbal.