Cost elements overlap in assgnmt lines 11 and 10, PA trans.str. Y1,COArPA01

Apr 17, 2017 at 08:01 AM

63

avatar image

Message no. KE0C020

Hi experts ;

When i'm trying to assign cost elements in PA transfer structures the system display the following error :

Assignment lines 11 and 10 of PA transfer structure Y1 contain overlapping cost elements in controlling area PA01. At least one cost element is assigned to both lines. Consequently, this cost element cannot be assigned correctly during settlement.

In my case , i have to assign the same cost element group for example for raw material standard and variances ,

Please , can y help me to solve this problem ;

Thanks in adavance.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Miya Wang
Apr 24, 2017 at 07:11 AM
0

Hi,
This is the system standard design. The cost element can't be overlapped. Otherwise, how should the system to determine in case the same cost element belongs to two different assignments?

Best regards,
Miya

Share
10 |10000 characters needed characters left characters exceeded
Hemanthkumar Chittibomma Apr 24, 2017 at 10:15 AM
0

Dear Morad Khalfi,

As suggested by Miya wang, system behavior is standard.

Generally we dont create variances gl accounts as cost elements .Still wondered,how come you have created cost elements for variance g/l accounts and more over subsumed under same cost element group for both raw material standard and variances?

Best Regards,

Hemanthkumar