Skip to Content
0
Former Member
Nov 22, 2006 at 10:39 AM

SRM: Manufaturer Part number

54 Views

Hi,

we have an SRM-Plan Driven Procurement scenarious, integrated with a MySAP Aerospace and defence.

In SRM, after migration of requisition, we create Auction or Bid invitation, and then we create a PO or a Contract in Backend.

In that standard version of R/3 there is a Routine that having internal code (MATNR) the system translate it in the Manufaturer Part number inserted in a field of the same material master data.

In this way the vendor, in external document like PO or RFQ, can display the external number (MFRPN) instead of internal code (MATNR).

In migration of material master data from R/3 to SRM, Our goal should be find the way, to have both the material code so that vendors can use in SRM, in their bid, the Manufaturer Part number.

Regards.

Simone Buffoni