Skip to Content
author's profile photo Former Member
Former Member

BPML Process flow

<i>Hi Floks

how design design BPML process do u know send me . certain links or documents to my mail id [email removed by moderator and we request to make all postings public]or forums. thanks </i>

with regards,

suresh

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Nov 21, 2006 at 07:09 AM

    Suresh,

    please refer post :

    How to model a parallel process in BPML

    here a link to a Visio template is given or you could use tools like ARIS or INTALIO for designing your processes using BPMN standards..

    Arun

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 04, 2006 at 09:05 AM

    <i>> how design design BPML process</i>

    Hi Suresh,

    BPML was created by BPMI.org. It was never very successful. In fact we did enable it in SAP Business Workflow but based on this experience we settled for BPEL instead - which is what the ccBPM in XI supports.

    Best regards,

    Alan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 29, 2006 at 02:53 PM

    Hi suresh duwuri,

    BPML: The Business Process Master List, along with the Business Blueprint, is a key result of the second phase of the Roadmap. Microsoft Excel tables contain the SAP scenarios, process groups, and processes that have been set in scope in the SAP Reference Structure, and are crucial for configuring your SAP System. In Realization, the third phase of the Roadmap, the BPML provides the basis for monitoring and steering test activities and for configuring your SAP System. It contains the titles of the structure items, and displays the status, the owner, links to documentation and links to the SAP System. Amongst other things, the BPML allows you to:

    1) Set your baseline and final scope. These are used for baseline and final configuration.

    2) Access the Project IMG and specific IMG activities assigned to structure items.

    3) Access integration test plans, which help you carry out all required integration tests.

    The Prerequisite is you have set the project scope.

    Process Flow to use the Business Blueprint as a basis for configuring your SAP System:

    1) Set the project scope.

    2) Generate the Project IMG.

    3) Generate the BPML.

    4) From a specific processes in the BPML, you can go to the relevant IMG activities and make Customizing settings

    Pls go through the link,

    http://www.ebpml.org/bpml.htm

    http://xml.coverpages.org/bpml.html

    Cheers

    Hareesha k

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 09, 2007 at 07:05 AM

    Following is one of the format for designing BPML -

    1. Value Cycle

    2. Core Business Process Area

    3. Business Scenario

    4. Business Process

    5. Business Event Transaction (Std/Z)

    For example below is given for one of the Value Cycle –

    Supply Chain Management

    Production Planning

    Get Information

    Display Master Data for Production

    Display Bill of Material CS03

    Hope the above helps you.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.