availibilty control error while doing budgeting

Former Member
0 Kudos

Hello

I am budgeting for newly created project, I am getting error message for one of the WBS Element that "Budget is exhausted in document item WBS element ABC-000006-XXX-01" .My budget profile has Activation Type= 1; Automatic activation during budget allocation, Usage 0.00 %, Overall check box "checked" , Release check box "unchecked", Object currency check box "Checked".

Time frame Past=3, Future=5, Start=0. Total values check box "checked" and Annual Values check box "checked".

I am not sure where I am doing mistake, can you please help?

Deepak

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hello Friends,

This issue got fixed. Problem was with tolerance limit configuration.

Deepak M Pitale

Former Member
0 Kudos

small correction:

*I am getting error message for WBS element ABC-000006-XXX-01 wherein I am planning cost for design using internal activity, I have work-center and activity type. I am not getting error message for manufacturing WBS ABC-000006-XXX-02 element and below WBS elements.*

Former Member
0 Kudos

One more thing to add, below is my project structure:

ABC-000006 Level 1 WBS Element
ABC-000006-XXX Level 2 WBS Element
ABC-000006-XXX-01 WBS for Head Design --> Internal activities for Design
ABC-000006-XXX-02 WBS Element for Manufacturing
ABC-000006-XXX-02-01 WBS for Sub Assembly 1
ABC-000006-XXX-02-02 WBS for Sub Assembly 2.

I am getting error message for WBS element ABC-000006-XXX-01 wherein I am planning cost for design using internal activity. I have

work-center and activity type. I am getting planned cost for this WBS element and not for manufacturing WBS element and below WBS element.

Sooner the reply will be better.

Deepak