We were using material determination condition earlier A->B, but due to some reason requirement changed and condition was reversed B-> A.

After the condition is changed the material A is still getting replaced by B in CRM system where as working fine with ECC system.

can anyone help me in explaining why it is happening ?

Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

former_member185613
Contributor
0 Kudos

Hi Gaurav,

Looks like the condition record that you changed in ECC is not replicated to CRM and the old entry still exists, Make sure to replicate the change (the delta change should have got replicated ideally) and that should solve the issue.